Categories | Roof Tile Roll Forming Machine |
---|---|
Brand Name: | FMS |
Model Number: | Double Layer |
Certification: | CE,ISO |
Place of Origin: | China |
MOQ: | 1 set |
Price: | Negotiable |
Payment Terms: | T/T, Western Union |
Supply Ability: | 35 sets per month |
Delivery Time: | 30days |
Packaging Details: | Main machine is nude,the computer control box is packed by plastic. |
Product Description: | Automatic Curving Metal Grain Silo Sheet Roll Forming Machine For Silo Mill Side Panel |
Raw material: | GL GI PPGL PPGI |
Dimension(L*W*H): | 8500mmx1500mmx1700mm |
Roller material: | High-grade 45# Stee |
thinckness: | 0.9-3.5mm |
Voltage: | 380V 50Hz 3phases |
Cutting blade material: | Cr 12 High Grade Steel |
Power: | 10kw |
Weight: | about 12500kg |
Speed: | 1-2 pcs/min |
Automatic Curving Metal Grain Silo Sheet Roll Forming Machine For
Silo Mill Side Panel Factory Price.
Main Features
1. The roll forming machine can rollform metal profile. After roll
formed by this roll forming machine, the surface will be very
smooth and beautiful without any scratch on surface.
2. Rollforming process:uncoiler, straightening,rollforming, cut to
length,Runout table.
3. Fully Automatic Control System with PLC.
4. Easy operation: Key in the length and quantity on the control
panel.
5. One year warranty.
6. we also can do a custom roll forming machine, We can design the
machine according to your specification and profile drawing.
7. One roll forming machine can produce one or two profiles.
.
Detailed Parameters:
Suit material | Gi /Carbon steel/Stainless steel |
Feeding width | 1000mm |
Sheet thickness | 0.9-3 5mm |
Roller material | Bearing steel, heat treatment, surface polishing, hard chromium
plating |
Power | Main power 30kw+hydraulic station 22kw |
Roller station | 20 rollers |
Leveling roller station | 9 rollers |
Speed | 1-2 pcs/min |
Guarantee
1. Guaranteed against malfunctions due to manufacturing defects for1 years after date of purchase except Electrical parts.
2. Repairs will not be performed even during the guarantee period in the follow circumstances
- Damage occurs due to a natural disaster
- Malfunction occurs due to user error
- Malfunction occurs due to modifications
- Malfunction occurs due to further movement or shipment after installation
Payment terms
40% in advance as down payment
60% is paid before the shipment is processed
Delivery
FOB: Tianjin Xingang Port
The Delivery Time: 30 days after the down payment is received.
![]() |