Categories | Cold Roll Forming Machine |
---|---|
Brand Name: | Red Power |
Model Number: | MZ2017082501 |
Certification: | ISO CE SGS |
Place of Origin: | Jiangsu, China |
MOQ: | 1 Set |
Price: | negotiable |
Payment Terms: | L/C, T/T, Western Union, MoneyGram, D/A, D/P |
Supply Ability: | 20 sets per month |
Delivery Time: | 45 days after receiving 30% deposit |
Packaging Details: | Nude package in 40 Foot container |
Material: | Steel |
Main motor: | 22KW |
Name: | Roll forming machine |
Color: | Optional |
Use: | C Channel |
Driven: | by gear box |
Hydraulic power: | 7.5KW |
Thickness: | 3mm |
Working speed: | 20 meters /min |
Voltage: | 380V, 50HZ |
Product Introduction
We are professional manufacturer of all kinds of cold roll forming machine, this C channel roll forming machine is use for making solar photovoltaic stents, which is very hot recently in China, even the worldwide, all the machines are customized.
The components of the machine
Roll forming machine | 1 set |
Hydraulic cutter | 1 set |
Electrical control system | 1 set |
Hydraulic system | 1 set |
Normal output table | 3 PC 1m*1m |
Manual de-coiler | 1 set Max. loading 5 T |
Technical paraments
Discription | |
Machine Size | 20000mm*1500mm*1200mm |
Machine Weight | About 8 T |
Frame Materials | 350H steel |
Material | 40Cr quenched and tempered material |
Forming roller | GCr15 Forging Hard Chrome Plating |
Cutting System | Hydraulic Cutting |
Main Engine power | 4 KW with cycloidal reducer |
Forming Rows | 13 rows |
Forming Speed | 15m/min |
Pressing Thickness | 1-3mm |
Driving mode | Gear drive |
Electric Control System | SIEMENS/ Schneider |
Motor Power | 22 kw |
Servo feeding power | 3.8kw |
Pump Station Motor | 4KW |
After sale services
1). Engineer will give free training lessons to labors in buyer’s factory.
2). The Buyer will buy the round-trip air ticket for Engineer if visa application is approved. The buyer is also responsible to bear expenses generated, e.g. visa formalities, meals, accommodation and allowance of USD80 for engineer.
3). During this guarantee period, we will provide spare parts without any charge in case of quality discrepancy caused by us. If the malfunctions are caused by your incorrect operations, we will provide the buyer spare parts at cost price.
We will charge the buyer cost price of spare parts beyond one year and provide long-term technical guide.
Machine pictutres