Home > Chains >

Aluminium Alloy Metal Products EL ZINC Alloy For Bag / Mold Metal Parts

Categories Custom Metal Parts
Brand Name: NO MARK
Model Number: SOOCK
Certification: CE
Place of Origin: CHINA
MOQ: Negotiation
Price: 0.2-10
Supply Ability: 10000
Delivery Time: 5-8 Working days
Packaging Details: 100 pcs per box
Material: AL metal parts
Size: base on buyer asked
Type: any type can do base on buyer design
OEM: OEM, ODM drawing for build mold
drawing: can drawing base on buyer sample or image
  • Product Details
  • Company Profile

Aluminium Alloy Metal Products EL ZINC Alloy For Bag / Mold Metal Parts

Advanced OEM/ODM Customized 8 Years Rich Professional Production Aluminum Alloy
1. One piece in a plastic bag for small parts, and then 20 Pcs or 50 Pcs in a large plastic bag, and then packed in a 5-layer corrugated cardboard carton boxes.
2. One piece in a bubble bag for large parts, and then then packed in a 5-layer corrugated cardboard carton boxes, but customized according to part size
3. For weight more than 100Kg, wooden pallet packing before shipping.

Item Advanced OEM/ODM Customized 8 Years Rich Professional Production Aluminum Alloy Material available Steel,

Aluminum, Brass, Titanium, Plastic, Organic Glass etc.Surface TreatmentSandblasting,

Anodizing, Electroplating, Alodine, Polishing, Powder-Coated, Baking Varnish etc.

ProcessingTurning, Milling, Drilling, Wire EDM, Welding, Casting, Forging, Assembling,

etc.

Tolerance+/-0.001mm or +/- 0.00004"

Drawing FormatCAD / PDF/ DWG/ IGS/ STEP

Quality ControlISO9001:2008 , 100% inspection before shipmentProduction capacity4000pcs/dayExperience12 years of CNC machining service

Packaging standard export carton with pallet or as per customs’ requirements

Lead Timedepending upon customers' request

Term of PaymentT/T, L/C, Escrow, PayPal, western unionShipment Terms

1) 0-100kg: express & air freight priority

2) >100kg: sea freight priority

3) As per customized specifications

Delivery Time 1. Sample can be sent to your hand within 7 days upon request.

2.Mass production: 25~45 days after receipt of deposit (may vary depending on specific items and item quantities)

Quality Aluminium Alloy Metal Products EL ZINC Alloy For Bag / Mold Metal Parts for sale
Send your message to this supplier
 
From:
To: Ready China Technical Co.,ltd
Subject:
Message:
Characters Remaining: (0/3000)
 
Inquiry Cart 0
Company Info
  • Haven't found right suppliers
  • Our buyer assistants can help you find the most suitable, 100% reliable suppliers from China.
  • And this service is free of charge.
  • we have buyer assistants who speak English, French, Spanish......and we are ready to help you anytime!
  • Submit Buying Request
    Contact Us Quickly